Monday, March 23, 2009

Good progress this weekend


Completed mounting and drilling the driver's side footwell. Started on the passenger side as well. Broke all my drill bits, so had to stop... Also picked up the bearings for the front end so I can mount the front brakes. Had to go to 3 stores and 2 trips to get 4 bearings.... arghhh.

Took the brake pedal to a machine shop over the weekend to get it shortened to work with the manual brakes. Will pick it up today. Also the clutch quadrant kit should arrive today as well. With the brake pedal and clutch quadrant kit, I should be able to reassemble the pedal box together and install.

No comments: